This will be used for cleaning off your tools.
Smooth rubbed finish concrete.
Types of concrete finishes 1.
What are the differences in appearance and cost for smooth rubbed grout cleaned and cork float finishes for formed concrete surfaces.
A smooth rubbed finish should be applied no later than the day after form removal.
No grout is used other than cement paste that is drawn from the concrete by the rubbing process.
The wetted surface is rubbed with carborundum brick or other abrasive until uniform color and texture are achieved.
After the concrete is laid in the formwork and leveled the trowel is used to smooth and fine level the surface of concrete.
So the operator can apply water and grind concrete simultaneously.
A grout cleaned finish is similar to what many contractors call a sack rubbed finish.
The water plus the rubbing action brings up a cement paste which results in a very smooth plaster like surface.
The surface just before finishing.
Smooth rubbed no later than the day following formwork removal wet surface and rub it with an abrasive such as a carborundum brick until a uniform color and texture are produced.
Grind smooth any drips or bumps of concrete left on the wall.
Finishing process is conducted by slow speed grinding disc wheel at the same time applying water.
Trowel finish is the most common and popular finish of concrete used for major types of applications.
In the earlier version of this specification aci 301 89 a smooth form finish did not require rubbing.
Cleveland concrete contractor ron simonetti says a smooth rubbed finish done with an abrasive stone should look the same as a grout cleaned sacked finish.
Concrete to receive membrane waterproofing shall receive a smooth form finish in accordance with aci 301.
The water and the rubbing action brings up a cement paste which makes concrete very smooth plaster like surface.
How to rub out new concrete walls step 1.
You want the surface to be as flat and clean as.
Wet rubbing is accomplished on green concrete by a slow speed grinding wheel or disc at the same time applying water.
However stone rubbing has to be done soon after the forms are removed within a day or two at the latest while enough moisture is still in the concrete to create a paste that will fill the bug holes.
Under aci 301 96 therefore the specifier who wants a smooth off the form finish untouched by rubbing on concrete exposed to public view will have to call this out as a special finish.