Refer to the rain carrying table in this booklet for the maximum allowable panel length per.
Shingle to metal roof transition detail.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
Repeat this step at the opposite side of the roof frame and.
Mc08a roof layout quick reference.
The transition point can be a source of problems if not done correctly.
Mc10d double lap tile.
Roofing multi ply sbs modified bitumen paradiene 20 30 rigid insulation.
Also you don t have to find a place to store the shingles now.
Mc09 suggested loading guide.
You see it provides an extra layer for covering your home.
Mark this point of the transition with a marking crayon.
Tar will not fix the problem and will look like and when you do go back to fix the leak the tar will be heck to deal with.
The transition has to be prepared properly with the right underlayments including high temperature ice and water shield when metal is being installed.
Mc10b eave flush wall.
Mc10c low slope ventilated eave detail.
Conical pipe boot non split.
To ensure you and your customers have the resources needed to get the job done we ve developed instructional videos that show your customers how to seamlessly integrate pitch transition trim with our high quality metal roof panels.
Mc10a down slope eave details.
The best thing is it can reduce your cooling costs even more.
Mc10 raised fascia.
You can save on labor costs by putting metal roofs over shingles.
Use the transition flashing made by the metal company and do it right.
Roof pitch the metal roofing panels shown in this manual require a mini mum slope of 2 per foot to ensure proper drainage.
Conical pipe boot split.
About press copyright contact us creators advertise developers terms privacy policy safety how youtube works test new features press copyright contact us creators.
Coated metal wall scupper.
Pitch transition points can be a source of problems.
String the line along the top of the frame until it meets the shingle roof.
Coated metal roof edge.